Private Residents-St Helens

Work undertaken during the project;

  • Old loose paving flags took up and cleaned off for re-use.
  • Clearance and disposal of waste at the bottom of garden.
  •  The topsoil was then scraped off and stored for re-use at a later date.
  •  A new hardcore sub-base was then layed and compacted.
  • The old paving flags were then relayed.
  • The topsoil was then re spread over the area to be turfed.
  • The garden was then turfed and flower bed formed using decorative edgings.